Reengineering Roof Design to Deliver Superior Water Management and Long-Term Performance

15 View Court, Port Moody, BC V3H 3X3

In this case study, we explore how a full roofing and drainage redesign improved performance, durability, and long-term maintenance.

Project Context

Scott’s project involved more than a standard roof replacement. His home featured an aging built-in EPDM gutter system that had become inefficient and difficult to maintain. With the roof already due for replacement, this created an opportunity to rethink the entire roofing and drainage approach. The goal was to modernize the system, improve water flow, and reduce long-term upkeep.

The Challenge

The key challenge was correcting an outdated drainage design while replacing the roof in Port Moody. Built-in gutter systems are prone to water retention and ongoing maintenance issues. Solving this required structural modifications to the roof edge, including rebuilding the fascia to support a new external drainage system. This added complexity beyond a typical roofing project.

Why The Client Chose Us?

Scott chose Vantage Roofing Ltd. because he needed a contractor capable of delivering a complete solution. Our ability to combine structural carpentry, drainage redesign, and premium roofing installation set us apart. Additionally, the Malarkey Emerald Pro Warranty provided long-term protection that aligned with his investment goals.

How We Responded?

We began by removing the existing roofing materials and built-in gutter system to expose the underlying structure. Our team then modified and rebuilt the fascia to create a vertical surface for seamless exterior gutters.

After completing the structural work, we installed new plywood decking and prepared the roof with high-performance waterproofing layers. The system included Malarkey Arctic Seal ice and water barrier, synthetic underlayment, and a full Malarkey shingle system.

We also upgraded all ventilation and roof penetrations, installed a new skylight, and reinforced waterproofing across critical areas. By addressing both roofing and drainage together, we ensured a fully integrated system.

The Results?

The completed project delivered a fully modernized roofing and drainage system. The new seamless exterior gutters significantly improved water flow while eliminating the maintenance challenges of the previous built-in system.

With upgraded ventilation, premium materials, and comprehensive waterproofing, Scott’s home is now better protected and easier to maintain. Backed by a 50-year Malarkey warranty and a 10-year workmanship guarantee, the project provides long-term reliability and peace of mind.