Our team is insured and fully compliant & in good standing with WorkSafe BC.

A Complete Roofing Upgrade Designed for Long-Term Performance

3823 Michener Way, North Vancouver, BC V7K 3C7

In this case study, Vantage Roofing transformed Alexander’s aging roof, skylights, flat decks, drainage, and exterior finishes.

Project Context

Alexander’s North Vancouver home had an aging cedar roof along with two flat deck areas covered with SBS roofing. The property also included multiple skylights, roof penetrations, and exterior drainage components that required attention during the renovation.

The project scope included:

Removal of the existing cedar roofing and installation of a Malarkey Vista asphalt roofing system.

Installation of new 1/2-inch plywood sheathing across the main roof deck.

Replacement of five existing skylights with Columbia curb-mount fixed-glass units.

Reconstruction and replacement of two SBS-covered deck roofs.

Installation of new drains, sumps, tapered insulation, and concealed drainage piping.

Upgrades to roof ventilation, plumbing flashings, B-vents, stem vents, and goose-neck vents.

Installation of new metal fascia, black perforated aluminum soffits, seamless gutters, and downspouts.

Property protection, debris containment, and complete final cleanup.

The project was also supported by Vantage Roofing Ltd.’s 10-year workmanship warranty, the 50-year Malarkey Emerald Pro warranty, and applicable manufacturer warranties.

The Challenge

The main challenge was the number of different roofing and drainage details that needed to function together.

Converting the cedar roof required more than simply installing new shingles. Once the existing roofing was removed, the roof deck needed a consistent substrate, so new 1/2-inch plywood was installed across the entire roof. Damaged fascia areas also had to be inspected and repaired where necessary before the roof-edge details could be completed.

The two SBS deck roofs presented a separate construction challenge. They required a full rebuild rather than a simple resurfacing. New openings through the deck floors, drains, sumps, and tapered insulation were needed to create purposeful drainage paths. The design also called for the drainage piping to be concealed within a new cover around the support pole, improving both function and appearance.

The skylights, ventilation, fascia, soffits, gutters, and downspouts added further points of coordination. Each component had to be sequenced carefully so that waterproofing, flashing, roof edges, and drainage transitions were completed properly.

Why The Client Chose Us?

Alexander chose Vantage Roofing Ltd. because the company could manage both sloped and flat roofing within one coordinated project.

Vantage’s proposal brought the entire scope together, including the cedar roof conversion, SBS deck roofing, skylights, ventilation, drainage, fascia, soffits, and gutters. This meant that important transitions could be planned as part of the installation instead of being treated as separate details after the main roofing work was complete.

The project also included Vantage’s 10-year workmanship warranty, along with manufacturer warranty coverage for the Malarkey roofing system and Columbia skylights. This provided additional confidence that the completed work would be supported beyond installation.

How We Responded?

Vantage began by protecting the property, establishing site-safety systems, and preparing the work area for removal and reconstruction.

On the main roof, the existing cedar roofing was removed so the roof deck could be inspected. New 1/2-inch plywood was installed across the roof, creating a uniform substrate for the new roofing assembly. Damaged fascia areas were repaired where required before the roof-edge components were installed.

The new Malarkey Vista roofing system was constructed with Arctic Seal protection at the eaves and valleys, synthetic underlayment, starter shingles, Vista AR shingles, RidgeFlex hip and ridge components, and new metal valley and edge details. New intake and exhaust ventilation were integrated into the installation, along with renewed flashings for plumbing, mechanical, and exhaust penetrations.

The five skylights were replaced during the re-roofing process. The existing units were removed, the openings were inspected and prepared, and waterproofing and flashing were integrated with the surrounding roof assembly. New Columbia curb-mount fixed-glass skylights were then installed before the adjacent shingles were completed.

The two SBS deck roofs required a more involved reconstruction. Existing roofing and deck finishes were removed, and new plywood and dimensional lumber were installed where specified. The deck assemblies were rebuilt with a vapour barrier, ISO insulation tapered to create positive drainage, and Sopraboard. A new two-ply Soprema SBS membrane system was then installed with new perimeter flashings, drains, sumps, and drainage details.

After the roofing work was completed, Vantage installed new metal fascia, black perforated aluminum soffits, seamless five-inch continuous gutters, and 2×3 downspouts. The project concluded with debris removal, a final site sweep, and magnetic cleanup to help ensure the property was left in good condition.

The Results?

Alexander’s home now has a coordinated roofing and exterior system that addresses both appearance and performance.

The former cedar roof was replaced with a complete Malarkey Vista asphalt roofing assembly installed over new plywood sheathing. The roof also received updated ventilation, waterproofing, flashing, valleys, and roof-edge details. The five skylights were replaced with new fixed-glass units, with their flashing and waterproofing integrated into the surrounding roof.

The two SBS deck roofs were rebuilt beneath the finished membrane to introduce purposeful slope and new drainage routes. Water is directed toward the newly created drains and sumps, while the drainage piping is concealed within the redesigned support-pole cover.

New fascia, soffits, gutters, and downspouts complete the exterior renewal and create a connected path for water collection and discharge from the roof to the ground.

The completed project is backed by Vantage Roofing Ltd.’s 10-year workmanship warranty, the 50-year Malarkey Emerald Pro warranty, and applicable Columbia skylight product warranty coverage.